Tewksbury Planning Board Approves Two Family Suite Permits at January Meeting

TEWKSBURY — January 12, 2026 — Tewksbury Planning Board unanimously approved two family suite special permits and a revised commercial signage plan at its January 12 meeting. The board cleared an 867-square-foot addition at 54 Charles Drive, presented by Paul O'Keefe of O'Keefe and Sons Contracting, to house homeowner Deneen Doucette's elderly parents; a second permit went to Joseph Hubbard of Hubbard Construction for a one-bedroom suite at 100 Jenny's Way, which will include a full sewer tie-in from an existing septic system. On the signage front, architect Christina McMahon of CAC secured board approval to update the master signage plan for the mixed-use development at 910 Andover Street, swapping a French bistro aesthetic for a 1950s diner look for the future Elena's Donuts cafe; the revised sign measures roughly 4 feet 2 inches tall and just over 7 feet long — smaller in total area than permitted by right but slightly taller in height, a trade-off the board accepted while reserving the right to review final lighting shop drawings. A fifth agenda item, 485 Main Street, was continued to February 9 at the applicant's request.

Keep reading with a 14-day free trial

Subscribe to The Tewksbury MA Post to keep reading this post and get 14 days of free access to the full post archives.

Already have an account? Sign in. Ask about this instead

A subscription gets you:

  • Subscriber-only posts and full archive
  • Post comments and join the community
  • 24x7 access to local news

Subscribe to The Tewksbury MA Post

Don’t miss out on the latest issues. Sign up now to get access to the library of members-only issues.
jamie@example.com
Subscribe

More local coverage: Middlesex County News · The Townsend Post · The Tyngsborough Post · The Wakefield Post · The Waltham Post · The Watertown Post

Part of the Townbrief network — local government coverage for 350+ Massachusetts towns.